News

Appeal on Lae-Kabwum Road Project

Pinterest LinkedIn Tumblr

A call has been made to Planning Minister and Finschhafen MP, Renbo Paita, Deputy Prime Minister.and Member for Lae, John Rosso and the Prime Minister, James Marape to attend the launching of the Lae-Kabwum Road Project on the 31st of August 2023.

The call by a committee of Lae-Kabwum Road Project wants to see the road connect five electorates and link up more than two hundred thousand people.

Districts included in this project are Kabwum, Finschhafen, Tewai-Siassi, Nawaeb and Lae Open.

The FISIKA Region has a high quality of agricultural products including coffee, livestock and fresh produce of immense economic value.

Committee Chairman Robert Ayang said the road was supposed to be built years back.

“The link has been missing for 137 years since the first Lutheran missionaries arrival in the country and through Morobe. There is currently no road. The only mode of transport used is air by the third level airline,” said Ayang.

The construction of the Lae, Finschhafen, Sialum and Wasu or the FISIKA road will open doors for major economic developments for Morobe.

A team of engineers from the Morobe Provincial Government are in Kawbum District with GPS machines, funded by the Morobe Provincial Government.

Lae-Kabwum Road Project

Mr. Ayang said, the team covered Burum-Kuwat in Finschaffen District and are now in Kawbum District. Ayang also confirmed that walking is another mode people use, especially from Lae to Indagen in Kabwum and as further to Wasu in Tewai-Siassi District. Mr. Ayang, said the mode of walking has caused a lot of lives due to no road. This includes those that lost their lives when walking from Lae to Indagen in Komba LLG, Kawbwum to attend the 100 Year Anniversary Celebration of the Lutheran Church in 2019.

The committee had already sent invites to the Morobe MPs and the Prime Minister to attend the launching in Indagen, Kabwum District. They’ve called on their Leaders and the Prime Minister to accept the invite and attend the launching. Chairman Ayang said, “In 2019, the Prime Minister, James Marape went to Indagen village to celebrate the 100 Year Anniversary Celebration with the people of Kabwum and made a commitment of K100 million.” Ayang said the PM’s commitment follows an act dramatized by the locals on how people died when walking from Lae to Indagen to celebrate the 100 Year Anniversary Celebration of the Lutheran Church. Ayang said, “To date, nothing has been done concerning the Prime Minister’s commitment, the people of FISIKA Region are still waiting.”

Committee Chairman Robert Ayang on the commitments made by Prime Minister James Marape.

Meanwhile, the Secretary of the Lae-Kabwum Road Project, Sebastian Singery said the office of National Planning has a copy of the Project concept through a submission made by the Provincial Support Improvement Program(PSIP) office in 2021. He said eight districts of Morobe have roads linking to Lae, except for Kabwum and Tewai-Siassi District. Singery called on the MPs and the LLG leaders of the FISIKA Region to unite and work together with the committee for in order to connect the missing link that would benefit the people of FISIKA.

Recent: https://insidepng.com/court-declares-jason-peter-huon-gulf-mp/

Comments are closed.

Pin It